Skip to content

Glossary

Each word defined in plain sentences, with its formula where it has one and the guide that works it through.

Plan the quarter10 min readUpdated By Gero OS

The short answer

A ratio is how many of an activity one result takes. Pace is what is left of a count, divided by the working days left and rounded up. To carry over a goal is to move an unfinished goal into the new period on purpose. A leading number is a count you can move this week. The lagging number is the outcome it moves.

Key takeaways

  • The quarter number is the outcome. Every other word here exists to reach it.
  • Ratio = activity counted ÷ results won. Volume = results × ratio.
  • Pace = what is left ÷ working days left, rounded up.
  • Leading numbers are the counts you do this week. The lagging number is the outcome they move.
  • A weekly review gives each open goal one answer: done, carry over or drop.
On this page7 sections

What is a quarter number?

A quarter number is the outcome you want by the end of a quarter, written as a number with a unit. New customers, signed pilots and partnerships are units. It is the result, not the work. You can count it on the day it happens, and the quarter is judged on it.

Outcome

An outcome is a result you can count on the day it happens: a customer signs, a pilot starts. A goal names an outcome, and a project is the work that serves it. If your number is revenue, turn it into customers first: divide it by what a typical customer brings. Worked through in how to break a quarterly goal into weekly and daily goals.

Unit

The unit is what the number counts: new customers, demos, partnerships. A goal without a unit cannot be split, because nobody can say what one of it is.

Quarter, month and week goals

A quarter goal is an outcome for a calendar quarter. A month goal sits under a quarter goal, and a week goal under a month goal. Each is an outcome you can finish inside its period. Weeks run Monday to Sunday, numbered the ISO way: a week belongs to the month that holds its Thursday.

The focus rule

The focus rule is a ceiling of three. Hold three quarter goals at most. The same goes for the month goals under each of them, and for the goals of a week. More goals split the same hours. One is often enough. See how many goals to hold per quarter.

What are a source, a ratio and a count?

They are the words for the work behind the number. A source is where results come from. A ratio is how many of an activity one result takes. A count is how much of that activity a period takes.

Source

A source is a way results reach you, with the number of results you expect from it: cold outreach, referrals, a content channel. The sources of a goal add up to its number. When they fall short, you have found the gap before the quarter starts.

Activity

An activity is the thing you do and can count inside a source: a cold call, a cold mail, a LinkedIn DM, a post. A source can hold several activities.

Ratio

A ratio is how many of an activity one result takes: calls per new customer, mails per demo. Formula: ratio = activity counted ÷ results won, over the same weeks. It starts as a guess, labelled as a guess, and gives way to what your own logs show. See finding your own ratio.

Volume

A volume is the total of an activity that a period needs. Formula: volume = results from that activity × its ratio.

Count

A count is how much of an activity a period takes, and how much of it is done: this quarter, this month, this week, today. A count tells you when today is done. How many cold calls a day works a count back from a goal.

Example

The words on one plan: 25 new customers in Q1 2027

  • Quarter number: 25 new customers.
  • Sources: 10 from cold calls and 15 from LinkedIn DMs. 10 + 15 = 25 new customers.
  • Ratios: 150 cold calls per new customer and 60 LinkedIn DMs per new customer. Both are the calculator’s starting guesses, not benchmarks.
  • Volumes: 1,500 cold calls and 900 DMs for the quarter.
  • Counts: 540 calls in January, 135 in Week 1, 27 on a working day.
  • Working days: 63 in the quarter, counted from Monday 4 January.
Q1JanuaryWeek 1A working day
25 new customers259——
Cold calls10 new customers at 150 cold calls each1,50054013527
LinkedIn DMs15 new customers at 60 LinkedIn DMs each9003248117
Worked out with the calculator, as of Sunday 22 November 2026. The grid shows the plan on Monday 4 January. It counts Monday to Friday and doesn’t know your holidays.

What is a working day, and what is catch-up pace?

These words turn a volume into something a day can hold. A working day is a weekday, Monday to Friday. Pace is what is left, divided by the working days left. Catch-up pace is that same sum after you have fallen behind.

Working day

A working day is a weekday, Monday to Friday. No formula knows your public holidays or your leave, so take them out yourself. A volume is split over working days, not calendar days or weeks, so a short week carries less.

Split

A split is a volume shared over months, weeks and working days in whole numbers that add up exactly. Each share is rounded down, and the units left over go to the shares that lost most in the rounding.

Pace

The pace is the count a working day needs from here. Formula: pace = what is left of the period ÷ its working days left, rounded up. Work it out again each morning, so it moves with what you did.

Shortfall and lead

A shortfall is what a past day or week left undone. A lead is what it did beyond its count. Either moves into the days left: a shortfall raises the pace, and a lead lowers it. The past is not rewritten.

Catch-up pace

Catch-up pace is the pace after a gap. Formula: catch-up pace = (goal − done) ÷ working days left in the quarter, rounded up. If it is nearly double your best logged day, change the plan on purpose instead of absorbing it. See what to do when you’re behind and the catch-up pace calculator.

Example

Catch-up pace: 520 of 1,500 cold calls made

  • On Monday 15 February 2027, 520 of the 1,500 cold calls for Q1 2027 are made.
  • An even pace would be at 727 by now: 207 behind.
  • The even pace counts the calendar quarter from Friday 1 January: 64 working days. The plan above counts 63, from Monday 4 January, the Monday its first week starts.
  • 980 cold calls left over 33 working days: 30 a day.
  • The formula: (1,500 − 520) ÷ 33 working days, rounded up, is 30.
Counted from Monday 15 February 2027, Monday to Friday, no public holidays. Worked out by the catch-up calculator’s own code.
Every formula in one line
TermFormulaWhat it tells you
RatioActivity counted ÷ results wonHow many of an activity one result takes
VolumeResults × ratioHow much of an activity the quarter needs
PaceWhat is left ÷ working days left, rounded upWhat a working day takes from here
Catch-up pace(Goal − done) ÷ working days left in the quarter, rounded upThe daily count after a gap
GapDone − where an even pace would be by nowHow far behind or ahead you are

What are leading and lagging numbers?

A lagging number tells you what happened: customers won, revenue booked. A leading number is one you can move this week: calls made, mails sent, posts published. Set the lagging number once a quarter, and run the week on the leading ones.

Lagging number

A lagging number is an outcome, counted after the work is done. The quarter number is a lagging number. It tells you whether the quarter worked, too late to change the week.

Leading number

A leading number is a count of an activity that brings the outcome in, and that you control today. A ratio ties it to the lagging number. Without the ratio it is only a busy number. See leading vs lagging indicators for startups.

The lagging number says where the quarter ends. The leading numbers say what today takes.

What do done, carry over and drop mean?

They are the answers a weekly review gives each open goal. A goal that is not done is carried over on purpose or dropped on purpose. Nothing stays open by default.

Weekly review

A weekly review is a fixed moment each week. Each of last week’s open goals gets an answer, the counts are read against their targets, and the goals for the new week are written. See how to run an honest weekly review.

Done

Done means the outcome happened. Not almost, and not the work behind it: the goal named a number, and the number is there.

Carry over

Carry over means the goal is still worth doing, so it moves into the new period. The old period keeps its record as it was. Carrying over is a decision, made once per goal per review.

Drop

Drop means the goal is no longer worth its hours, and it is closed without being done. Dropping is honest. Leaving a goal open week after week is not.

Next step

The next step is the one thing to do now, picked by a rule in a fixed order. Overdue comes first, then what is due today, then today’s count, then this week’s goal, then your main project. See what should I work on today.

How do the terms fit together?

In one chain, from the quarter down to today. Each word takes the one before it as its input.

  1. Quarter number.

    The outcome, its unit and the quarter.

  2. Sources.

    The results each source should bring. They add up to the quarter number.

  3. Ratios.

    How many of each activity one result takes. A guess says it is a guess.

  4. Volumes.

    Results × ratio, for each activity.

  5. The split.

    Each volume over the months, the weeks and the working days, in whole numbers that add up.

  6. Counts.

    What this week and today take, and what is done of it. These are the leading numbers.

  7. Pace.

    What is left ÷ working days left, rounded up, worked out again each morning.

  8. Weekly review.

    Done, carry over or drop for each open goal, then the goals for the new week.

To see the chain with your own numbers, type them into the quarterly goal calculator. It needs no login and saves nothing.

Questions

What is a ratio in goal planning?

A ratio is how many of an activity one result takes: calls per customer, mails per demo. You get it by dividing the activity you counted by the results you won over the same weeks. Until you have logs it is a guess, and it should be labelled as one.

What is the difference between pace and catch-up pace?

Pace is what is left of a period divided by its working days left, worked out every morning. Catch-up pace is the same sum after a gap, over the rest of the quarter. Take goal minus done, divide by the working days left and round up.

What does carry over mean for a goal?

It means the goal was not done in its period, and you decided it is still worth doing. It moves into the new period, and the old period keeps its record. The other honest answers are done and drop.

Is a leading number the same as a leading indicator?

Yes, in plainer words. A leading indicator is a number you can move now that is tied to a later result. Here it is always a count of an activity, such as calls made this week, tied to the outcome by a ratio.

Why count working days instead of weeks?

Because weeks are not equal. A week cut short by a month’s end or a holiday has fewer working days. Split a volume by weeks and that short week gets too much. Split it by working days and every day carries the same load.

Start with one number.

Tell us yours, and we’ll email you about changes to Gero. Gero itself is free: start any time.

One line. It tells us what to build for.

Free to join. Gero is free too, with limits.

Already use Gero? Sign in.